Issue - meetings
TM/21/02301/FL - Area 14, Kings Hill Phase 3, Gibson Drive, West Malling
Meeting: 23/02/2022 - Area 2 Planning Committee (Item 10)
10 TM/21/02301/FL - Area 14 Kings Hill Phase 3, Gibson Drive, Kings Hill PDF 357 KB
Erection of a Class E retail unit with access, car parking and associated works at Area 14, Kings Hill Phase 3, Gibson Drive, Kings Hill, West Malling
Additional documents:
Minutes:
Erection of a Class E retail unit with access, car parking and associated works.
RESOLVED: That the application be GRANTED in accordance with the submitted details, conditions, reasons and informatives set out in the report of the Director of Planning, Housing and Environmental Health subject to the amendment of conditions 2 and 16 and the addition of Informative 4 as set out below:
(1) Amended Conditions:
2. This decision refers to the red-edged site location plan, drawings numbered Block Plan 17139 101C dated 23.08.2021, Site Plan 17139 102B dated 23.08.2021, Demolition Plan 17139 109B dated 23.08.2021, Sections 17139 115A dated 23.08.2021, Boundary Treatment 17139 121F dated 23.08.2021, Landscaping 17139-VL_L01C dated 23.08.2021, Location Plan 17139 100C dated 23.08.2021, Artist's Impression 17139 SHP KINGS HILL M_01 CGI_02 dated 23.08.2021, Planning Statement dated 23.08.2021, Other dated 23.08.2021, Statement Energy Rev 2 dated 23.08.2021, Other LCA (Concept Design)_Rev 2 dated 23.08.2021, Desk Study Assessment P1 dated 23.08.2021, Desk Study Assessment P2 dated 23.08.2021, Desk Study Assessment P3 dated 23.08.2021, Design and Access Statement 17139 01 dated 23.08.2021, Waste Management Strategy 17139-WRS01 dated 23.08.2021, Flood Risk Assessment 3787 366 dated 23.08.2021, Ecological Assessment 9729 dated 23.08.2021, Other Appendix A dated 23.08.2021, Other Appendix B dated 23.08.2021, Other Appendix C dated 23.08.2021, Other Appendix D dated 23.08.2021, Other Appendix E dated 23.08.2021, Other Appendix F dated 23.08.2021, Other Appendix G dated 23.08.2021, Other Appendix H dated 23.08.2021, Transport Assessment dated 23.08.2021, Travel Plan dated 23.08.2021, Lighting External dated 23.08.2021, Report Pre Assessment dated 23.08.2021, Noise Assessment R1(FINAL)-18.8.21 dated 23.08.2021, Report SGN Manual V3 dated 23.08.2021, Statement 20210816 Community Involvement dated 23.08.2021, Tree Protection Plan 21055-4-PDF dated 23.08.2021, Arboricultural Assessment 21055-AA3-JB dated 23.08.2021, Floor Plan 17139 111B dated 21.01.2022, Proposed Roof Plan 17139 112B dated 21.01.2022, Proposed Elevations 17139 113E dated 21.01.2022, Proposed Elevations 17139 114F dated 21.01.2022, Other Note to officer dated 21.01.2022, Other Planting palette dated 21.01.2022, Other Validity of traffic survey dated 21.01.2022, Site Plan 17139 110K dated 07.02.2022, The development shall be carried out in accordance with these approved drawings. There shall be no variations from these approved drawings.
Reason: To ensure that the scheme proceeds as set out in the planning application and therefore remains in accordance with the Development Plan.
16. The development shall be carried out in accordance with all of the recommendations contained within the Preliminary Ecological Appraisal dated April 2021 reference 9729.PEA.vf and as shown on drawing 17139-110 Rev K.
Reason: To ensure that the development is carried out in accordance with the plans and documents hereby approved.
(2) Additional informative:
4. The applicant is encouraged to investigate whether a left turn in and left turn out arrangement for the proposed junction between the site’s access road and Alexander Grove would help to manage vehicular access to and from the site.
[Speakers: A statement was read out on behalf of Mr D Rush (member of the public) and a verbal statement was made Mr D Pannell (on behalf of the Applicant).]